Casas de Ruumar Bed and Breakfast-Bar-Two rooms for family available | Bed & Breakfast in Clarin

| 9.6 (110 Reviews) |   Pet Friendly   5 Bedrooms  5 Bathrooms  12 Guests
Clarin Bed & Breakfast | Casas de Ruumar Bed and Breakfast-Bar-Two rooms for family available

5 Bedroom Bed & Breakfast in Clarin

Comfortable Accommodations

Casas de Ruumar Bed and Breakfast-Bar-Two rooms for family available in Clarin offers family rooms with private bathrooms, air-conditioning, and garden views. Each room includes a balcony, terrace, and free WiFi.

Exceptional Facilities

Guests enjoy a sun terrace, garden, bar, and a year-round outdoor swimming pool. Additional amenities include a private check-in and check-out service, outdoor fireplace, and free on-site private parking.

Delicious Breakfast

A variety of breakfast options are available, including continental, American, vegetarian, vegan, and Asian. The property provides room service and a barbecue area for outdoor dining.

Local Attractions

Located 17 mi from Chocolate Hills, 30 mi from Baclayon Church, and 31 mi from Tarsier Conservation Area. Cycling activities are popular nearby.

Casas de Ruumar Bed and Breakfast-Bar-Two rooms for family available is located in Clarin.

This 5 Bedrooms Bed & Breakfast is suitable for tourists and travelers. It has several amenities that would guarantee your comfort. These amenities include: View, Balcony/Terrace, Transportation/Shuttle, and several others. This is a 3 star rated property and has over 110 reviews with the average score of 9.6 . Coming to Clarin and needing a place to stay? Be it for work or for leisure, consider staying at this Bed & Breakfast for your next visit, you will surely love it.

You can check the reviews and description of this 5 Bedrooms Bed & Breakfast if you want to learn more about this place in Clarin. These details are authentic, as they are provided by our partner, booking.com.

This Casas de Ruumar Bed and Breakfast-Bar-Two rooms for family available in Clarin is well equipped and has all facilities that have been listed below. Please note that these details were shared to us by booking.com for the listed “Casas de Ruumar Bed and Breakfast-Bar-Two rooms for family available”. We solely rely on their shared details and are regarded as “accurate”. If you have any concerns about the information or accuracy describing this Bed & Breakfast, please let us know.

Show more

Amenities

Air Conditioner
Parking
Pet Friendly
Pool
Designated Smoking Area
View
Balcony/Terrace
Transportation/Shuttle
Security/Safety
Sports/Activities
Fireplace/Heating
Restaurant
Bar
Guest Services
Breakfast
Barbecue/Outdoor Cooking
Child Friendly
Internet
Laundry

Facility Overview

Breakfast
  • Kids' meals
  • Special diet meals (on request)
  • Bar
Parking
  • Free parking
  • Parking on site
  • Private Parking
  • Parking
Activities
  • Cycling
  • Snorkeling
General
  • Non-smoking rooms
  • Soundproof rooms
  • Family rooms
  • Designated smoking area
  • Wifi in all areas
  • Pet friendly
  • Air conditioning
Guest Services
  • Shuttle service
  • Daily housekeeping
  • Private check-in/out
  • Airport shuttle (additional charge)
  • Baggage storage
  • Laundry
  • Fax/Photocopying
  • Grocery deliveries
  • Packed lunches
  • Airport shuttle
  • Car rental
  • Room service
  • Shuttle service (additional charge)
  • Invoice provided
Internet
  • Internet
  • Free Wifi
  • Wifi
Outdoors
  • Garden
  • Outdoor fireplace
  • Outdoor pool (year-round)
  • Terrace
  • Outdoor furniture
  • Picnic area
  • Outdoor pool
  • Sun deck
  • BBQ facilities
Security/Safety
  • Security alarm
  • Smoke alarms
  • Key access
  • CCTV outside property
  • CCTV in common areas
  • 24-hour security
  • Fire extinguishers
  • Guests have the option to cancel any cleaning services for their accommodation during their stay
  • Linens, towels, and laundry washed in accordance with local authority guidelines
  • Guest accommodation disinfected between stays
  • Breakfast to-go containers
  • Food can be delivered to guest accommodation
  • All plates, cutlery, glasses, and other tableware sanitized
  • Staff follow all safety protocols as directed by local authorities
  • First aid kits available
Spa
  • Swimming pool
Transportation/Shuttle
  • Airport drop-off
  • Airport pickup

Policies

Check-in
The minimum age for check-in is 18
Cancellation policy
Non refundable
Pet Policy
Pets are allowed upon request and charges may apply.

Please inform of your expected arrival time in advance. you can use the special requests box when booking, or contact the property directly using the contact details in your confirmation, payment before arrival by bank transfer is required. the property will contact you after you book to provide instructions, guests under the age of 18 can only check in with a parent or official guardian, managed by a private host

Reviews

Value for money:
9.44
Location:
8.72
Staff:
9.89
Facilities:
9.22
Comfort:
9.83
Cleanliness:
9.72
TREVOR
Jul 2, 2026 07:00:00 AM
Review Score:   10
United Kingdom
Reviewer Type: Couple
Travel Purpose: leisure
Positive: This is a hidden gem in the North of Bohol. Even my wife’s family, who live in nearby Clarin, didn’t know about it! If you’re looking for a traditional Filipino guest house I would certainly recommend Casas de Ruumar. The rooms are spacious, clean and comfortable. All have air-con and a floor-standing fan. There are also mosquito screens fitted to all the windows which is a great touch. The gardens here are beautiful, the pool is crystal clear and regularly cleaned, and the breakfast is amazing! I’ve not had such a great breakfast anywhere else in the Philippines other than at five star hotels in the city. Regarding the staff, both owners Rudi and Maria are perfect hosts, and cannot do enough for you. They are welcoming and super friendly, and nothing is too much trouble. Their helper, Donna, is a delight. She was on hand to aid us whenever we needed it and always with a beautiful smile. We will definitely be returning here whenever we are in Clarin, and I would recommend this place to anyone travelling around Bohol.
Negative: There’s nothing I didn’t like about Casas de Ruumar. But one thing I would say to anyone coming here by car, don’t bring a big car, as although there is parking inside the property grounds, it is quite tricky if you have a large car.
Summary: A Hidden Gem in the beautiful Island of Bohol.
See All Reviews

Room Arrangement

Room Info Facilities
Family Room with Balcony
Room Type: Family
Room Size: 15 m2
1 Queen bed(s) Bed
Family Room with Balcony

Food & Drink

Tea/Coffee maker, Bottle of water, Minibar

Bathroom

Walk-in shower, Free toiletries, Toilet paper, Shower, Bathtub or shower, Body soap, Towels, Private bathroom, Toothbrush, Toilet

General

Trash cans, Soundproof, Hardwood or parquet floors, Ironing facilities, Private entrance, Iron, Key access, Fire extinguisher, Fan, Smoke Alarm, Air conditioning

Outdoors

Terrace, Outdoor furniture, Outdoor dining area, Private pool, Balcony

Kitchen

Electric kettle, Wine glasses, Cleaning products, Refrigerator, Dining table

View

Pool view, View, Quiet street view, Garden view

Services

Wake-up service

Living Area

Dining area

Bedroom

Linens, Childrens' cribs

Accessibility

Upper floors accessible by stairs only

Room amenities

Non-feather pillow, Drying rack for clothing, Hypoallergenic pillow, Clothes rack, Socket near the bed

Physical distancing

Single-room AC for guest accommodation
One-Bedroom Chalet
Room Type: Chalet
Room Size: 25 m2
1 Queen bed(s) Bed
One-Bedroom Chalet

Food & Drink

Tea/Coffee maker, Bottle of water, Minibar

Bathroom

Walk-in shower, Free toiletries, Toilet paper, Shower, Bathtub or shower, Body soap, Towels, Private bathroom, Toothbrush, Toilet

General

Trash cans, Soundproof, Tile/Marble floor, Ironing facilities, Private entrance, Iron, Key access, Fire extinguisher, Fan, Smoke Alarm, Air conditioning

Outdoors

Terrace, Outdoor furniture, Outdoor dining area, Private pool, Balcony

Kitchen

Electric kettle, Wine glasses, Cleaning products, Refrigerator, Dining table

Living Area

Desk, Dining area

View

View, Garden view

Services

Wake-up service

Bedroom

Linens, Childrens' cribs

Room amenities

Non-feather pillow, Drying rack for clothing, Hypoallergenic pillow, Clothes rack, Socket near the bed

Physical distancing

Single-room AC for guest accommodation
Family Room with Garden View
Room Type: Family
Room Size: 21 m2
1 Sofa bed Bed
1 Queen bed(s) Bed
Family Room with Garden View

Food & Drink

Tea/Coffee maker, Bottle of water, Minibar

Bathroom

Walk-in shower, Free toiletries, Toilet paper, Shower, Bathtub or shower, Body soap, Towels, Private bathroom, Toothbrush, Toilet

General

Trash cans, Soundproof, Tile/Marble floor, Ironing facilities, Private entrance, Iron, Key access, Fire extinguisher, Fan, Smoke Alarm, Air conditioning

Kitchen

Electric kettle, Kitchenware, Wine glasses, Kitchenette, Cleaning products, Refrigerator, Dining table

Outdoors

Terrace, Outdoor furniture, Outdoor dining area, Private pool, Balcony

Living Area

Desk, Sitting area, Sofa, Dining area

View

View, Garden view

Services

Wake-up service

Bedroom

Linens, Childrens' cribs

Room amenities

Non-feather pillow, Drying rack for clothing, Hypoallergenic pillow, Clothes rack, Socket near the bed, Sofa bed

Physical distancing

Single-room AC for guest accommodation
Apartment with Garden View
Room Type: Apartment
Room Size: 21 m2
1 Queen bed(s) Bed
Apartment with Garden View

Food & Drink

Tea/Coffee maker, Bottle of water, Minibar

Bathroom

Walk-in shower, Free toiletries, Toilet paper, Shower, Bathtub or shower, Body soap, Towels, Private bathroom, Toothbrush, Toilet

General

Trash cans, Soundproof, Tile/Marble floor, Ironing facilities, Private entrance, Iron, Key access, Fire extinguisher, Fan, Smoke Alarm, Air conditioning

Kitchen

Electric kettle, Kitchenware, Wine glasses, Kitchenette, Cleaning products, Refrigerator, Dining table

Outdoors

Terrace, Outdoor furniture, Outdoor dining area, Private pool, Balcony

Living Area

Desk, Dining area

View

View, Garden view

Services

Wake-up service

Bedroom

Linens, Childrens' cribs

Room amenities

Non-feather pillow, Drying rack for clothing, Hypoallergenic pillow, Clothes rack, Socket near the bed

Physical distancing

Single-room AC for guest accommodation
Apartment with View and Balcony
Room Type: Apartment
Room Size: 21 m2
1 Queen bed(s) Bed
Apartment with View and Balcony

Food & Drink

Tea/Coffee maker, Bottle of water, Minibar

Bathroom

Walk-in shower, Free toiletries, Toilet paper, Shower, Bathtub or shower, Body soap, Towels, Private bathroom, Toothbrush, Toilet

General

Trash cans, Soundproof, Tile/Marble floor, Ironing facilities, Private entrance, Iron, Key access, Fire extinguisher, Fan, Smoke Alarm, Air conditioning

Kitchen

Electric kettle, Kitchenware, Wine glasses, Kitchenette, Cleaning products, Refrigerator, Dining table

Outdoors

Terrace, Outdoor furniture, Outdoor dining area, Private pool, Balcony

Living Area

Desk, Dining area

View

View, Garden view

Services

Wake-up service

Bedroom

Linens, Childrens' cribs

Room amenities

Non-feather pillow, Drying rack for clothing, Hypoallergenic pillow, Clothes rack, Socket near the bed

Physical distancing

Single-room AC for guest accommodation

FAQ's

Is this Clarin bed & breakfast pet-friendly for guests?

Yes, pets are allowed at this property. Check the guest reviews to learn what guests had to share.

What time is check-in & check-out at Clarin bed & breakfast?

Check-in time for Clarin bed & breakfast starts counting from 2:00 PM and check-out is until 11:00 AM. However, early check-in or late check-out can sometimes be negotiated between the guest and the owner or the manager of this property.

Does the Clarin bed & breakfast have a swimming pool?

Yes, this Clarin bed & breakfast has a swimming pool. Check the Facility Overview section for details about the pool and other available facilities.

How much does it cost per night to stay in Clarin bed & breakfast?

Best-rates for the Clarin bed & breakfast starts from $40 per night with includes Fireplace/Heating, Parking, Pet Friendly, Designated Smoking Area, Security/Safety, Child Friendly, Air Conditioner, Pool, Guest Services, Laundry, Restaurant, Bar, View, Balcony/Terrace, Transportation/Shuttle, Sports/Activities, Internet, Breakfast, Barbecue/Outdoor Cooking with all other facilities. matches every traveler with their perfect accommodation, whether you are traveling with a group, friends, family, or pets.

Is Clarin bed & breakfast a family-friendly place to stay?

Based on the information we have received from the owner or our partner, this is considered to be a family-friendly property. Families have rated this bed & breakfast 3 stars or guests have recommended them suitable for families. As reported by the owner or manager, the bed & breakfast has specified that children are welcome. Please see details about suitability for your family or inquire with the property to learn more.

Is the Clarin bed & breakfast wheelchair accessible or offer services for disabled guests?

Based on the information received from our partner, the Clarin bed & breakfast has not specified they are wheelchair accessible. Likewise, there is not an elevator specified as being available at the property. Specific accessibility details may be addressed in the property details section of this page.

What is the minimum night stay policy for the Clarin bed & breakfast?

Based on the information reported by the owner or manager, the Clarin bed & breakfast indicates 1 day stay policy at this bed & breakfast. Guests are cautioned that the minimum stay policy may differ based on seasonality or availability and may be at the discretion of the owner or manager.

What cancellation policy is in place for Clarin bed & breakfast?

Guests are cautioned that the cancellation policy may differ based on seasonality, availability, or current travel restrictions. Guests should also be aware that this policy may be subject to change and should be confirmed prior to booking. More details may be available on this page in the property description. However, early check-in or late check-out can sometimes be negotiated between the guest and the owner or the manager of this property.

Check Bed & Breakfast Availability
Nightly rates from:
USD40
You will be redirected to  
Hot Deal - It has been viewed 211 times today
Not the right fit? Check out our other properties in Clarin
Johanna's Farm From US $14
         

10.0 (8 Reviews)
Cabin
  • Parking
  • Pet Friendly
  • Security/Safety
Asuneus Farm From US $21
         

|
10.0 (1 Review)
Cabin
  • Air Conditioner
  • Parking
  • Balcony/Terrace
LHOYJEAN Garden Hostel From US $9
         

9.8 (376 Reviews)
Hostel
  • Parking
  • Pet Friendly
  • Designated Smoking Area
Seeya Hotel From US $36
         

|
8.4 (8 Reviews)
Hotel
  • Air Conditioner
  • Parking
  • Wheelchair Accessible
Khloe Serenity Guest House From US $9
         

9.8 (127 Reviews)
Hostel
  • Parking
  • Pet Friendly
  • View
Calape Forest Resort From US $27
         

|
7.4 (16 Reviews)
Hotel
  • Parking
  • Pool
  • Designated Smoking Area
Jolits EcoGarden Hostel From US $7
         

9.7 (105 Reviews)
House
  • Parking
  • Pet Friendly
  • Designated Smoking Area
MJS Campsite and Mountain Resort From US $27
         

|
New
Resort
  • Parking
  • Designated Smoking Area
  • TV
Sarah's Garden BnB & BnB Spa SARAH HOUSE RENTAL From US $15
         

9.7 (6 Reviews)
Bed & Breakfast
  • Air Conditioner
  • Parking
  • View
Darling's Backpacker's Inn From US $5
         

9.7 (3 Reviews)
Hostel
  • Parking
  • Pet Friendly
  • TV
Casas de Ruumar Bed and Breakfast-Bar-Two rooms for family available From US $40
         

|
9.6 (110 Reviews)
Bed & Breakfast
  • Air Conditioner
  • Parking
  • Pet Friendly
Bohol Hammock Hostel From US $16
         

9.5 (384 Reviews)
Hostel
  • Parking
  • TV
  • View
JOE'S CASTLE From US $26
         

|
9.4 (35 Reviews)
Bed & Breakfast
  • Air Conditioner
  • Parking
  • Pet Friendly
Roca's Homestay Backpackers Chalet From US $10
         

9.0 (78 Reviews)
Hostel
  • Air Conditioner
  • Parking
  • Pet Friendly
Sarah's Garden BnB & Spa SARAH'S HOUSE RENTAL From US $14
         

|
8.7 (34 Reviews)
Bed & Breakfast
  • Air Conditioner
  • Parking
  • Designated Smoking Area
Sarah's Garden BnB & Spa SARAHS HOUSE RENTAL From US $38
         

8.5 (4 Reviews)
Bed & Breakfast
  • Air Conditioner
  • Parking
  • Pet Friendly
Calape Forest Resort From US $35
         

|
7.5 (77 Reviews)
Resort
  • Air Conditioner
  • Parking
  • Pool
Camilas Payag From US $36
         

7.0 (3 Reviews)
Apartment
  • Air Conditioner
  • Parking
  • Pet Friendly
home stay rizalina From US $11
         

|
6.8 (8 Reviews)
House
  • Parking
  • Designated Smoking Area
  • Balcony/Terrace
Angel's Staycation From US $41
         

New
House
  • Air Conditioner
  • Parking
  • Pool
RACRES Travellers Inn From US $27
         

New
House
  • Air Conditioner
  • Parking
  • Pet Friendly